AProject
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments
AProject – all about construction and repair
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments

Development of organizational and technological documentation

  • November 28, 2024

In the residential village, 230 two-story two-apartment residential buildings are built from three-, four-and five-room apartments and the necessary complex of cultural buildings (school, kindergartens and nursery, clinic, club, dining room, store, household services and others.). All buildings are equipped with a water supply, sewage, central heating, telephone, radio and television, as well as gas. For operational management of this construction, a network schedule was developed, which is a dynamic model of fluid construction. A multi -purpose schedule with an independent goal for each of the five parallel object flows. Two streams for the construction of residential buildings are depicted on a graph in an enlarged form indicating the transition from one object to another. Such enlargement in this case turned out to be possible, because a detailed schedule for the construction of a typical house with the image of relationships and interdependencies between a specialized. In parallel with the PPS, a project was developed for equipping construction brigades with sets of rational equipment for the main types of work. Each kit includes devices, inventory and tools that can be used in the construction of any type of buildings, regardless of volume-planning and structural solutions (main list), as well as equipment, the use of which is individual and depends on the design features of the object (additional list). Working drawings in three copies are presented for non -standard equipment. The development of organizational and technological documentation was only the first stage of work. An important task is the transition of construction organizations to a stream construction based on the network planning and management system.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

Choice of home tools: Electric saws

  • January 27, 2025
View Post

Choose good plastic windows

  • January 22, 2025
View Post

What are the sleeping places in the warehouse

  • January 20, 2025
View Post

Classification of slopes: which method to choose

  • January 20, 2025
View Post

Plumbing: a variety of species, which option to buy

  • January 17, 2025
View Post

Options for painting a wooden floor and carry out it

  • January 14, 2025
View Post

Vacuum pump – Building the house –

  • January 9, 2025
View Post

Increase the area of ​​the apartment with design

  • December 31, 2024
Featured Posts
  • Front door slopes
    • November 2, 2018
  • How to build a quick -made housing with your own hands
    • May 8, 2018
  • Where and how large -grained asphalt is used
    • August 20, 2018
  • Corrugated board – a worthy ratio of price and quality
    • February 18, 2019
  • Ceiling repair in the bathroom
    • December 24, 2024
Recent Posts
  • The choice of the fittings of plastic windows
    • January 27, 2025
  • Choice of home tools: Electric saws
    • January 27, 2025
  • The choice of diesel generator is the main criteria and principles
    • January 24, 2025
AProject – all about construction and repair
  • © Projectical.net, 2017-2024. All Rights Reserved.

Input your search keywords and press Enter.