AProject
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments
AProject – all about construction and repair
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments

Interior

76 posts

Choice of home tools: Electric saws

The choice of tool for your own use is not an easy task.
View Post

Choose good plastic windows

The right choice of plastic windows will give you a unique opportunity for a fairly long period of time just to just forget that the windows need to be changed…
View Post

What are the sleeping places in the warehouse

Folding sleeping places is difficult to overestimate when the arrival of a large number of guests or rest in the country on the agenda.
View Post

Classification of slopes: which method to choose

There is an opinion that if the windows are installed reliably and efficiently, then they have excellent isolation.
View Post

Plumbing: a variety of species, which option to buy

Among the variety of baths represented in the domestic market, acrylic baths are most popular.
View Post

Options for painting a wooden floor and carry out it

In order to get a truly qualitatively stained surface of a wooden floor, it is necessary to correctly approach both the choice of the material with which the work will…
View Post

Vacuum pump – Building the house –

The vacuum pump is intended mainly for pumping vapors or gases to the selected pressure level.
View Post

Increase the area of ​​the apartment with design

Most designers are used to working with a large area.
View Post

DIY floor repair. Parquet.

When going to carry out floor repairs with your own hands, namely the parquet, then we need to consider all the options for this process.
View Post

Do -it -yourself one -room apartment repair

The repair of one -room apartment with your own hands will make it possible to manifest in all its glory and fully, your talent of a designer, the existence of…
View Post
Featured Posts
  • What you need to know when laying a slate
    • September 19, 2018
  • We are insulated correctly. How to warm a house from logs?
    • December 30, 2024
  • This object has such a fate that involuntarily allocates it among others in Kazakhstan. The bridge across the Ural River in the administrative center of the West Kazakhstan region began to be built in the “good old days”, that is, under the Soviet regime. Since the republic never had their own organizations specialized in this case, bridge builders from different Russian cities worked here here. Then there was a notorious “parade of sovereignty”, followed by an economic crisis. Although the construction of the bridge continued, however, the payment of the executed volumes was now constantly delayed, or even at all moved away for an indefinite period. For this reason, the bridge builders stopped working several times. However, the object in Uralsk is one of the most significant in Kazakhstan, and therefore did not forget about it: the press periodically woke up this topic. Increased attention is also explained by the fact that the bridge across the Urals does not just connect the two banks of the river, it makes up an important link on the shortest path from Central Asia to the European part of Russia. As a result, the story of the invitation of bridge builders from a neighboring state was repeated again and again, without a visible result. There is a rather funny moment in it. A couple of years ago, when the President of Kazakhstan Nursultan Nazarbayev arrived in Uralsk, the local authorities invited him to take part in the solemn open… bridge over the Urals. The head of state made sensory words and cut the red ribbon. But when the ceremony ended and the president left, the entrance to the bridge was closed. The fact is that every driver who would decide to update the shortest path from Central Asia to Russia could well have been on the other side, but at the bottom of the river. The object was not over. And the main difficulty was not so much in building a car transition through the Urals itself, but in the construction of multi -kilometer approaches to it through a constantly flooded floodplain. And work here still start and finish. And now in the republic they decided to return to the long -suffering object again. The Ministry of Transport and Communications of the Republic of Kazakhstan announced the competition for state procurement of works and services for the reconstruction of the bridge over the Ural River. The required delivery time within 2000. Potential suppliers who meet the qualification requirements stipulated in Article 10 of the Law of Kazakhstan “On public procurement” are allowed to the competition.
    • January 8, 2025
  • How to use a sofa bed in a house
    • December 6, 2024
  • Features of reinforcement of finely chanted strip foundation
    • October 24, 2018
Recent Posts
  • The choice of the fittings of plastic windows
    • January 27, 2025
  • The choice of diesel generator is the main criteria and principles
    • January 24, 2025
  • Choosing cement for construction
    • January 24, 2025
AProject – all about construction and repair
  • © Projectical.net, 2017-2024. All Rights Reserved.

Input your search keywords and press Enter.