The easiest way to build a box of the house, the further stages of building a house will require significant efforts, you will have to coordinate the actions of many performers – you definitely cannot cope with your own hands. As a rule, one team of builders is engaged in finishing work, in which everyone knows what he should do and in what order the work is carried out.
Work on the organization of engineering networks at home requires several brigades, you will have to provide them with all the necessary building materials, which you need to purchase at the early stage of work so that the builders do not delay the deadlines. The work of the brigades must be carefully monitored so that it does not happen that one brigade has nothing to do, because another team made a mistake, or did not rationally distribute its working time. You can hire a qualified team with which you will not have problems.
The beginning of finishing work depends on the time of the year in which finishing work is carried out. Most building technologies can only be used at temperatures above 5 degrees. All “wet” processes need to be done before frost, if the work begins in autumn or winter, then it is necessary to put into operation a central heating system, windows and doors will also have to be installed immediately, as a rule, these are temporary options until the work is completed.