AProject
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments
AProject – all about construction and repair
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments

Finishing and facing materials

  • November 12, 2018

Materials for finishing and facing structures

In the construction of buildings, blocks of natural materials are often used – stone. Blocks must meet the requirements of GOST 9479. Sometimes a stone itself is used without impurities for decorative finishes both inside and outside the buildings. Modeling products with two and four faces are allowed. All products made of natural stone are divided into plates, steps, output and rectangular parapets. These products are most often produced by a rectangular or square shape. Natural stone slabs are produced for the decor of the internal and external sections of the building and structures according to GOST 9480. Architectural and construction products according to GOST 23342. For these GOSTs, they can be divided into sawn and chopped. These include basement, covering and window sills. Natural stone finishing slabs are made in different ways and divided into several groups – pressed and sawn from artificial blocks glued from pieces of stone. The most popular are glued from pieces of stone, as it can be a mosaic and an ornament. These plates are made according to GOST 24099, they are made of sand and crushed stone according to GOST 22856. Sawn slabs have a different surface from polished smooth and matte to the ribs around the perimeter to grinded with chips. Such plates are made of tufa, shell. Palette slabs are used only for decor during the interior decoration of the building or structure. The stone -processing enterprises are used for the manufacture of products and slabs from the GOST 9479 natural stone, and determine the size, shape and texture of acceptance control. For transportation, packaging, as well as when storing plates in accordance with GOST 9480. For road construction, a bottleneck and a barn -out natural stone is used. This stone is produced by sawn and stabbed. All brands and sizes, also the qualities of on -board stones are spelled out in GOST 6666. Farm stone is very often for city squares and streets. To give the architectural value of the avenues and squares, a beam stone is used in the form of a truncated pyramid. He should approach GOST 23668.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

Franchise and Excise Tax Reporting in America: Preparation Guidelines

  • February 11, 2026
View Post

How to choose real estate on the secondary market

  • June 2, 2025
View Post

What apartments are chosen for purchase and their features

  • June 2, 2025
View Post

Detailed information on the possible risks of investing in real estate

  • June 2, 2025
View Post

Your windows and stairs in the house should be of high quality

  • January 16, 2025
View Post

Options for work with material gypsum cardboard

  • January 15, 2025
View Post

Oplaning options for a one -room apartment: ready -made solutions

  • January 14, 2025
View Post

DIY repair bathroom

  • January 10, 2025
Featured Posts
  • This object has such a fate that involuntarily allocates it among others in Kazakhstan. The bridge across the Ural River in the administrative center of the West Kazakhstan region began to be built in the “good old days”, that is, under the Soviet regime. Since the republic never had their own organizations specialized in this case, bridge builders from different Russian cities worked here here. Then there was a notorious “parade of sovereignty”, followed by an economic crisis. Although the construction of the bridge continued, however, the payment of the executed volumes was now constantly delayed, or even at all moved away for an indefinite period. For this reason, the bridge builders stopped working several times. However, the object in Uralsk is one of the most significant in Kazakhstan, and therefore did not forget about it: the press periodically woke up this topic. Increased attention is also explained by the fact that the bridge across the Urals does not just connect the two banks of the river, it makes up an important link on the shortest path from Central Asia to the European part of Russia. As a result, the story of the invitation of bridge builders from a neighboring state was repeated again and again, without a visible result. There is a rather funny moment in it. A couple of years ago, when the President of Kazakhstan Nursultan Nazarbayev arrived in Uralsk, the local authorities invited him to take part in the solemn open… bridge over the Urals. The head of state made sensory words and cut the red ribbon. But when the ceremony ended and the president left, the entrance to the bridge was closed. The fact is that every driver who would decide to update the shortest path from Central Asia to Russia could well have been on the other side, but at the bottom of the river. The object was not over. And the main difficulty was not so much in building a car transition through the Urals itself, but in the construction of multi -kilometer approaches to it through a constantly flooded floodplain. And work here still start and finish. And now in the republic they decided to return to the long -suffering object again. The Ministry of Transport and Communications of the Republic of Kazakhstan announced the competition for state procurement of works and services for the reconstruction of the bridge over the Ural River. The required delivery time within 2000. Potential suppliers who meet the qualification requirements stipulated in Article 10 of the Law of Kazakhstan “On public procurement” are allowed to the competition.
    • January 8, 2025
  • Heating furnaces for heating residential premises
    • November 22, 2018
  • How to properly make a waterproofing roof
    • June 27, 2018
  • Bamboo wallpaper: varieties, advantages of use
    • April 11, 2018
  • Polyurethane varnish finishing with a brush
    • November 5, 2018
Recent Posts
  • Why is my refrigerator leaking water and how can I fix it at home
    • February 28, 2026
  • Franchise and Excise Tax Reporting in America: Preparation Guidelines
    • February 11, 2026
  • About the deadlines for apartment renovation: rules and advice
    • June 2, 2025
AProject – all about construction and repair
  • © Projectical.net, 2017-2024. All Rights Reserved.

Input your search keywords and press Enter.