The manufacture of modern devices in the form of partitions from conventional drywall, inherently, does not differ from work on installing sheets of drywall on the ceiling or on the walls in the room. Initially, it is necessary to prepare a special durable frame for drywall, sheathe such a frame neatly and efficiently with drywall sheets, then with the use of putty to carry out all the necessary finish work to fully design the manufactured partition. In the manufacture of the frame under the partition itself, it is quite possible to use a metal profile or any material made of wood (boards, stoves). Let’s try to understand the basic principles and rules that must be observed in the manufacture of a special frame for the future partition from drywall. Quite regardless of how many various profiles intended for the installation of drywall sheets are required, the starting of the partition will require the starting (so -called guide) profile, as well as the rack profile.
The most simple option for making the frame for the future partition made of drywall necessarily implies the creation of a single -layer frame, which is the result of which is sheathed on both sides by drywall sheets. If it is planned, then let any kind of communications through the inside of such a drywall septum, then they give preference to the manufacture of a double frame, which implies which the manufacture of the same two structures at the required distance from each other from a metal profile.
With the direct selection of a metal profile, it is necessary to proceed from the fact that in the cross section, a rack and guide profile must necessarily be the same width.
Having decided completely on the location of the future partition from sheets of drywall, then carefully mark the position of the starting profile on the floor, and also make markings on the walls and ceiling. It is possible and even necessary to use the level, roulette, corner, recitting cord, as well as a special plumb line for this. It is important to ensure that the lines are necessarily outlinedly outlined, and the future design of a completely perfectly horizontal. It is better to double -check the evenness of the structure several times than to subsequently get an ugly and uneven partition from drywall.