AProject
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments
AProject – all about construction and repair
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments

How to competently carry out waterproofing work

  • April 10, 2018

In almost all city apartments, the balcony is the coldest site. Many in the winter period of time adapt the balcony space under the refrigerator, taking out perishable foods there. But not everyone likes such a situation. There are people who want their balcony to be a warm and cozy room, a continuation of the room in which you can drink tea or coffee, enjoying the view of the city.

To insulate the balcony, you first need to carry out waterproofing work on it. To do this, its entire area must be covered with waterproofing material. Further in the corners of the balcony, the bars are nailed, the height of which is equal to the height of the balcony partition. Next, a layer of insulation is installed. You can use various materials. If the foam is used, then it can be fixed on the walls and ceiling of the balcony using liquid nails, if mineral wool, then it can be fixed on the walls using fasteners called “mushroom”. When the installation of the insulation is completed, we proceed to the installation of the crate of the balcony, on which plastic panels will be attached. To do this, we beat the slats to the previously fixed bars along the entire long -length of the balcony, along the entire area of ​​the walls. The result should be some semblance of a reinforcing mesh made of wood. The next step will be the fastening of the facing panels using a screwdriver or a construction stapler.

When the walls are insulated, proceed to floor insulation. Since the base of the balcony is concrete, you can first install a layer of insulation, and then a layer of waterproofing, on top of which a warm floor system will be installed. Of course, you can do without it, then after a waterproofing layer, you must lay a bars with an equal step on the floor, and put a heater between them and sew it all with sheets of chipboard, on which you can subsequently lay linoleum or any other flooring.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

The choice of the fittings of plastic windows

  • January 27, 2025
View Post

Choose a mirror in the bathroom

  • January 23, 2025
View Post

Choosing a good water filter

  • January 22, 2025
View Post

Classification of sealants: which one to choose

  • January 17, 2025
View Post

We take care of plastic windows correctly

  • December 31, 2024
View Post

Ursa insulation for a country house.

  • December 27, 2024
View Post

Installation technology seamless ceilings

  • December 23, 2024
View Post

Repair of a small kitchen: stages of work, advice of specialists

  • December 18, 2024
Featured Posts
  • Warming the walls of the house with fiberglass
    • December 26, 2024
  • Classification of polystyrene concrete: which option to choose
    • June 7, 2018
  • How to make the perfect roof: what you need to know
    • September 5, 2018
  • How to competently organize space in the children’s room
    • July 26, 2018
  • Kitchen repair – modern view
    • December 16, 2024
Recent Posts
  • The choice of the fittings of plastic windows
    • January 27, 2025
  • Choice of home tools: Electric saws
    • January 27, 2025
  • The choice of diesel generator is the main criteria and principles
    • January 24, 2025
AProject – all about construction and repair
  • © Projectical.net, 2017-2024. All Rights Reserved.

Input your search keywords and press Enter.