To build new housing, it is necessary to rearrange and disassemble the partitions, but also replace the old floors. As a rule, it is cheaper and easier to do than to repair old.
As soon as the dwelling was divided into new zones, that is, they built new partitions and walls, it is necessary to align the floor with the help of filling. First of all, it is necessary to install the beacons-orientes. This is a fairly responsible business, because in the future a new floor will be flooded with them. Lighthouses are installed in all directions and as often as possible. To install the beacons, you need a cement thick solution. When the beacons were set using the level, check the horizontal. Then you need to wait until the landmarks dry out. As soon as they dry, you can fill the floor with cement. Prepare a cement solution strictly according to the manufacturer’s instructions. The solution should have a consistency of sour cream, after which you can pour the floor. Pour cement to the floor, you need to start from the corner of the room, in no case from the middle.
It is necessary to carefully ensure that all the cracks and cavities are filled with a solution, and there was no irregularities. Pouring cement to the floor you need to align and smoothed it. The rule should be even and how to slide along the rails along the guides.
As soon as the first batch was smoothed, prepare the next one, and pour from the place where you stopped. Thus, the floor will be covered with an even layer of solution. When you smoot the connection line with the solution, carefully monitor that the surface is flat, since the solutions have different consistency can be obtained. As soon as this procedure is completed, you need to be patient and wait about 30 days. The duration of waiting depends on the quality of cement. And then you can start finishing.