AProject
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments
AProject – all about construction and repair
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments

The basics of topographic and geodetic works during construction

  • October 23, 2018

The construction of a new building involves the implementation of various kinds of tasks. The reliability of the structure depends on the quality of all work carried out, even preparatory. For example, geodetic surveys allow you to get accurate topographic materials, study the relief of the potential construction site, determine the combination of the future building with existing buildings, and also perform a comprehensive assessment of the territory.

There are some standards for completing topographic survey. Engineers highlight four common scale for geodetic surveys: 1: 100, 1: 200, 1: 500 and 1: 1000. Competently completed work is necessary for further design, construction and operation of a real estate facility.

The scope of geodetic surveys

Naturally, topographic survey is most in demand in large construction. This is a whole program of various tasks to identify relief features and conduct geoprogenization. The economic and technical feasibility of construction depends on the correctness of the work.

Since geodetic surveys are considered integrated work, they are divided into three main stages. Like any other work, engineering analysis begins with preparation. First, the technical characteristics of the building are studied, and documentation is also prepared. In the course of topographic and geodetic works, information about the terrain is collected. Then geodetic surveys are prepared on the basis of the requirements of the customer. At the end, permits are put in order, documented.

The second stage is a field. It begins with reconnaissance examinations of the future construction site. It is also necessary to carry out several field work, including the creation of a geodetic grid, the shooting of the area with special equipment and the preparation of planning and high-rise calculations.

The last stage is desk. It is necessary to update plans, coordinate communication systems and drawing up a technical report. Materials are connected to one project and transferred to the customer. Only after that can you start building a building.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

Choice of home tools: Electric saws

  • January 27, 2025
View Post

Choose good plastic windows

  • January 22, 2025
View Post

What are the sleeping places in the warehouse

  • January 20, 2025
View Post

Classification of slopes: which method to choose

  • January 20, 2025
View Post

Plumbing: a variety of species, which option to buy

  • January 17, 2025
View Post

Options for painting a wooden floor and carry out it

  • January 14, 2025
View Post

Vacuum pump – Building the house –

  • January 9, 2025
View Post

Increase the area of ​​the apartment with design

  • December 31, 2024
Featured Posts
  • Separation of space in the office
    • November 20, 2024
  • It is possible and necessary to glue the wallpaper on the ceiling
    • August 29, 2018
  • Repair the living room in the style of country
    • December 12, 2024
  • Simple methods how to refresh the interior of the apartment
    • September 7, 2018
  • What cover to make in a country house
    • September 10, 2018
Recent Posts
  • The choice of the fittings of plastic windows
    • January 27, 2025
  • Choice of home tools: Electric saws
    • January 27, 2025
  • The choice of diesel generator is the main criteria and principles
    • January 24, 2025
AProject – all about construction and repair
  • © Projectical.net, 2017-2024. All Rights Reserved.

Input your search keywords and press Enter.