AProject
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments
AProject – all about construction and repair
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments

Classification of metal tiles: what to pay attention to when choosing

  • May 28, 2018

Metal tiles are roofing sheets made of zinc steel. Their profile is very similar to the orderly tiled roof, and therefore, due to the shape of the roof slopes, it is possible to muffle the sounds a little, but for comfortable use in the attic and tent roofs this may also not be enough. The entire set of devices prevails in the metal tile, in the midst of which is spillles and fasteners, all this is done in the same color politician, which is important for a good external appearance. Elastic tiles are identical with tiles very remote, and then only along the edge of the form. The main advantage of the elastic roof is its highest level of sound insulation, also convenience during installation on the roofs of even a very complex shape. Apart from that, elastic tiles have resistance to different types of deformation, and also has a relatively small weight. Such a roof is a very good dielectric and reduces the possibility of snow slope from the surface of the roof. Clay tiles are quite expensive and fragile material, but at the same time it has a very huge service life, approximately 100 years. He has a lot of positive parameters of both multifunctional and aesthetic. Yes, and this species is not impeccable, it is exposed to microbes (mold, fungus, moss) which worsen the appearance of the roof. The main types of roofs are briefly described in this article, will help you decide on the choice of roof.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

Choosing windows for our home, we care about our family

  • January 24, 2025
View Post

Advantages of using mirror ceilings

  • January 21, 2025
View Post

Options for redevelopment of the apartment

  • January 13, 2025
View Post

This object has such a fate that involuntarily allocates it among others in Kazakhstan. The bridge across the Ural River in the administrative center of the West Kazakhstan region began to be built in the “good old days”, that is, under the Soviet regime. Since the republic never had their own organizations specialized in this case, bridge builders from different Russian cities worked here here. Then there was a notorious “parade of sovereignty”, followed by an economic crisis. Although the construction of the bridge continued, however, the payment of the executed volumes was now constantly delayed, or even at all moved away for an indefinite period. For this reason, the bridge builders stopped working several times. However, the object in Uralsk is one of the most significant in Kazakhstan, and therefore did not forget about it: the press periodically woke up this topic. Increased attention is also explained by the fact that the bridge across the Urals does not just connect the two banks of the river, it makes up an important link on the shortest path from Central Asia to the European part of Russia. As a result, the story of the invitation of bridge builders from a neighboring state was repeated again and again, without a visible result. There is a rather funny moment in it. A couple of years ago, when the President of Kazakhstan Nursultan Nazarbayev arrived in Uralsk, the local authorities invited him to take part in the solemn open… bridge over the Urals. The head of state made sensory words and cut the red ribbon. But when the ceremony ended and the president left, the entrance to the bridge was closed. The fact is that every driver who would decide to update the shortest path from Central Asia to Russia could well have been on the other side, but at the bottom of the river. The object was not over. And the main difficulty was not so much in building a car transition through the Urals itself, but in the construction of multi -kilometer approaches to it through a constantly flooded floodplain. And work here still start and finish. And now in the republic they decided to return to the long -suffering object again. The Ministry of Transport and Communications of the Republic of Kazakhstan announced the competition for state procurement of works and services for the reconstruction of the bridge over the Ural River. The required delivery time within 2000. Potential suppliers who meet the qualification requirements stipulated in Article 10 of the Law of Kazakhstan “On public procurement” are allowed to the competition.

  • January 8, 2025
View Post

You have a dishwasher in your kitchen

  • December 30, 2024
View Post

How to insulate the floor with expanded clay

  • December 25, 2024
View Post

Apartment renovation: make the ceiling with your own hands

  • December 17, 2024
View Post

Repair and decoration of turnkey apartments

  • December 12, 2024
Featured Posts
  • Drywall – universal building material.
    • July 3, 2018
  • Heating furnaces for heating residential premises
    • November 22, 2018
  • Office rental recommendations
    • December 4, 2024
  • The inconsistency of the development of architectural practice
    • March 5, 2019
  • Advantages of using glass in the construction sector
    • August 7, 2018
Recent Posts
  • The choice of the fittings of plastic windows
    • January 27, 2025
  • Choice of home tools: Electric saws
    • January 27, 2025
  • The choice of diesel generator is the main criteria and principles
    • January 24, 2025
AProject – all about construction and repair
  • © Projectical.net, 2017-2024. All Rights Reserved.

Input your search keywords and press Enter.