How to insulate the floor with expanded clay

  • December 25, 2024

Keramzit – translated from Greek – clay. This is a well -common artificial type of cell aggregate for concrete. It is also used for soundproofing and heat -insulating rafting in the construction of various structures. Ceramzit is produced, burning clay breeds consisting of minerals such as Montmorillonite, Cauline, Hydroslud, Palygorskite. When processing, heating in the spinning furnaces of such swollen, and slightly swollen fusive rocks, with additives in the form of peat, solar oil, sulfate-spire bard, sawdust-they receive artificially manufactured expanded clay.

The structure of expanded clay grain has the form of vitreous porous mass. Ceramzita pores have a closed spherical shape, with a thin, pierced shell. The stooped mass is crushed, as a result of which it turns out: expanded clay sand up to 0.5 cm in size, expanded clay gravel 0.5-4 cm and larger pieces – expanded clay gravel.

The popularity of the use of expanded clay lies in the complex of its properties: floor insulation and sound insulation. Its frost resistance is at least 15 cycles, and water absorption is up to 10-25%. Check the quality of work performed and prevent troubles to eliminate marriage, compliance with some rules will help.

When conducting insulation and soundproofing of the floor and other floor ceilings, remember that on these areas there is more load than on the walls. Therefore, it is necessary to take into account and calculate the thickness of the layer of expanded clay coating and cement screed, providing for the upcoming load on the floor. On the floor and other floors, before filling the expanded clay layer, it is necessary to put vapor barrier and waterproofing materials. Polyethylene film is also suitable. Her joints must be connected with tape. The canvas of the insulating material is laid out so that its edges go to the walls, to the level of the thickness of the future expanded clay layer.

To avoid the subsidence of expanded clay coating, it must be tightly laid. To do this, use expanded clay gravel of different fractions, from 0.5 to 2 cm in size. When mixing expanded clay fractions, there will be a denser shrinkage, fewer voids. Alignment of expense expense expense, is ensured by the preliminary installation of the beacons, since they are installed when aligned with cement-sand mixtures. The first beacon is installed at some distance from the wall, the subsequent beacons are installed parallel to each other. After installing the beacons, they are fixed with a solution of gypsum or alabaster. Such a mixture is applied to the beacon with a slide, aligned in the level of the alleged floor. After the mixtures harden, you can begin to fill up expanded clay material. Checked, compacted and leveled the total area of ​​the backfill, then covered with a cement screed.

The thickness of the cement screed should be at least 2 cm. A very liquid solution or cement “milk” is made, and expanded clay coating is poured.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

Choosing windows for our home, we care about our family

  • January 24, 2025
View Post

Advantages of using mirror ceilings

  • January 21, 2025
View Post

Options for redevelopment of the apartment

  • January 13, 2025
View Post

This object has such a fate that involuntarily allocates it among others in Kazakhstan. The bridge across the Ural River in the administrative center of the West Kazakhstan region began to be built in the “good old days”, that is, under the Soviet regime. Since the republic never had their own organizations specialized in this case, bridge builders from different Russian cities worked here here. Then there was a notorious “parade of sovereignty”, followed by an economic crisis. Although the construction of the bridge continued, however, the payment of the executed volumes was now constantly delayed, or even at all moved away for an indefinite period. For this reason, the bridge builders stopped working several times. However, the object in Uralsk is one of the most significant in Kazakhstan, and therefore did not forget about it: the press periodically woke up this topic. Increased attention is also explained by the fact that the bridge across the Urals does not just connect the two banks of the river, it makes up an important link on the shortest path from Central Asia to the European part of Russia. As a result, the story of the invitation of bridge builders from a neighboring state was repeated again and again, without a visible result. There is a rather funny moment in it. A couple of years ago, when the President of Kazakhstan Nursultan Nazarbayev arrived in Uralsk, the local authorities invited him to take part in the solemn open… bridge over the Urals. The head of state made sensory words and cut the red ribbon. But when the ceremony ended and the president left, the entrance to the bridge was closed. The fact is that every driver who would decide to update the shortest path from Central Asia to Russia could well have been on the other side, but at the bottom of the river. The object was not over. And the main difficulty was not so much in building a car transition through the Urals itself, but in the construction of multi -kilometer approaches to it through a constantly flooded floodplain. And work here still start and finish. And now in the republic they decided to return to the long -suffering object again. The Ministry of Transport and Communications of the Republic of Kazakhstan announced the competition for state procurement of works and services for the reconstruction of the bridge over the Ural River. The required delivery time within 2000. Potential suppliers who meet the qualification requirements stipulated in Article 10 of the Law of Kazakhstan “On public procurement” are allowed to the competition.

  • January 8, 2025
View Post

You have a dishwasher in your kitchen

  • December 30, 2024
View Post

Apartment renovation: make the ceiling with your own hands

  • December 17, 2024
View Post

Repair and decoration of turnkey apartments

  • December 12, 2024
View Post

Doors repair with your own hands

  • December 10, 2024
Featured Posts
  • Sooner or later, every owner of the apartment begins to think about repair.
    • March 18, 2019
  • Rhododendron is a blooming decorative shrub
    • May 21, 2018
  • DIY floor repair. Parquet.
    • December 20, 2024
  • How to build an airfield
    • April 9, 2018
  • How to use a sofa bed in a house
    • December 6, 2024
Recent Posts
  • The choice of the fittings of plastic windows
    • January 27, 2025
  • Choice of home tools: Electric saws
    • January 27, 2025
  • The choice of diesel generator is the main criteria and principles
    • January 24, 2025
AProject – all about construction and repair
  • © Projectical.net, 2017-2024. All Rights Reserved.

Input your search keywords and press Enter.