AProject
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments
AProject – all about construction and repair
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments

What did the kindergarten in Fukahori, Japan, look like after renovation?

  • June 2, 2025

This kindergarten is located in the northern part of Japan, specifically in Fukahori City, Nagasaki Prefecture, a coastal city with a long history of fishing and shipbuilding.

Traces of its history are still visible on the streets. The region has many slopes, and the houses are tightly packed with roads. These features create a quaint atmosphere in the narrow alleys. This project aims to bring the way Fukahori coexists with the surrounding nature into the children’s daily lives.

The site has an elevation difference of almost 7 meters and the terrain is uneven. The architecture turns these seemingly unfavorable conditions into an opportunity to minimize the impact on the environment and maximize play areas for children. Instead of leveling the land, the buildings are strategically placed to follow the natural contours. This reduces the need for excavation and transportation of soil, minimizing CO₂ emissions. The slopes naturally become a playground.

The kindergarten is made up of three parts: one at the top of the slope, one at the bottom, and a corridor between them that connects them. The corridor, reminiscent of the long narrow streets of the city, has a large staircase and an exciting climbing structure on a net. Children run up and down the large staircase and the slide in the playground, exploring and discovering new ways to play and learn. The entire kindergarten is a single space where the inside and outside combine to create an environment where “play” flows in all directions.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

What is Longling School in Shenzhen like after the renovation?

  • June 2, 2025
View Post

The headquarters building of the Hi-Tech Park (HTP) in Vietnam

  • June 2, 2025
View Post

Choosing windows for our home, we care about our family

  • January 24, 2025
View Post

Advantages of using mirror ceilings

  • January 21, 2025
View Post

Options for redevelopment of the apartment

  • January 13, 2025
View Post

This object has such a fate that involuntarily allocates it among others in Kazakhstan. The bridge across the Ural River in the administrative center of the West Kazakhstan region began to be built in the “good old days”, that is, under the Soviet regime. Since the republic never had their own organizations specialized in this case, bridge builders from different Russian cities worked here here. Then there was a notorious “parade of sovereignty”, followed by an economic crisis. Although the construction of the bridge continued, however, the payment of the executed volumes was now constantly delayed, or even at all moved away for an indefinite period. For this reason, the bridge builders stopped working several times. However, the object in Uralsk is one of the most significant in Kazakhstan, and therefore did not forget about it: the press periodically woke up this topic. Increased attention is also explained by the fact that the bridge across the Urals does not just connect the two banks of the river, it makes up an important link on the shortest path from Central Asia to the European part of Russia. As a result, the story of the invitation of bridge builders from a neighboring state was repeated again and again, without a visible result. There is a rather funny moment in it. A couple of years ago, when the President of Kazakhstan Nursultan Nazarbayev arrived in Uralsk, the local authorities invited him to take part in the solemn open… bridge over the Urals. The head of state made sensory words and cut the red ribbon. But when the ceremony ended and the president left, the entrance to the bridge was closed. The fact is that every driver who would decide to update the shortest path from Central Asia to Russia could well have been on the other side, but at the bottom of the river. The object was not over. And the main difficulty was not so much in building a car transition through the Urals itself, but in the construction of multi -kilometer approaches to it through a constantly flooded floodplain. And work here still start and finish. And now in the republic they decided to return to the long -suffering object again. The Ministry of Transport and Communications of the Republic of Kazakhstan announced the competition for state procurement of works and services for the reconstruction of the bridge over the Ural River. The required delivery time within 2000. Potential suppliers who meet the qualification requirements stipulated in Article 10 of the Law of Kazakhstan “On public procurement” are allowed to the competition.

  • January 8, 2025
View Post

You have a dishwasher in your kitchen

  • December 30, 2024
View Post

How to insulate the floor with expanded clay

  • December 25, 2024
Featured Posts
  • Which is hidden under the concept – the perfect floor
    • July 20, 2018
  • Clothing as one of the aspects of the welder protection
    • October 19, 2018
  • The advantage of private construction
    • January 25, 2019
  • Variety of showers and their characteristics
    • November 22, 2024
  • 5
    Detailed information on the possible risks of investing in real estate
    • June 2, 2025
Recent Posts
  • About the deadlines for apartment renovation: rules and advice
    • June 2, 2025
  • Carrying out apartment renovations under a contract
    • June 2, 2025
  • Handing over repairs: requirements, features and nuances
    • June 2, 2025
AProject – all about construction and repair
  • © Projectical.net, 2017-2024. All Rights Reserved.

Input your search keywords and press Enter.