AProject
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments
AProject – all about construction and repair
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments

What is a nasty glazing of a house

  • April 24, 2018

Currently, the systems and customers are increasingly popular among Builders and customers. In addition to the aesthetic side (large review, a lot of light), such glasses have good both technical and operational characteristics. It looks like a continuous glass wall without frames and racks from the street, which visually adorns the facade of the building. The main thing is that through such glass from the outside of the house nothing is visible. On the principle of operation, they look like a book, are located closer to the walls and completely open the view of the balcony or loggia. Glass in such structures use hardened, mainly Russian production. Fixed to the guides on the rollers. All details of this structure are made of high -quality stainless materials, which are not affected by the environment. Somewhere once a year you need to lubricate the videos with a silicone spray. Tempered glass in use is not dangerous, since it crumbles into small pieces that cannot cut the skin or dig.

At the moment, non -ramous glazing is a modern system used not only in European, but also in Russian construction. In addition to protecting the house from wind, rains, bad weather and noise, such a glass structure opens a magnificent view of the street for the owners of the house. The assembly and mount of non -ramous glazing should be installed by qualified specialists who have a license and education. In order for this type of glazing to serve you for a long time, you need to follow some rules. Namely, first of all, do not regulate the structure by ourselves, do not remove or put their details, do not knock on the glass. If there are any mechanical malfunctions, then for help you need to contact the specialists who were installed, or to the manufacturer to replace. But this is currently not happening, since manufacturers give a guarantee of quality.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

Choosing cement for construction

  • January 24, 2025
View Post

Advantages of the use of liquid nails

  • January 21, 2025
View Post

Important about fire doors

  • January 17, 2025
View Post

An important role of color in the interior

  • January 16, 2025
View Post

Options for materials for the construction of timber houses

  • January 13, 2025
View Post

Budget type fences option

  • January 10, 2025
View Post

Increase in sales of building materials

  • December 30, 2024
View Post

Warming the ceiling of the bath with your own hands

  • December 25, 2024
Featured Posts
  • How to correctly rent an apartment for rent
    • March 30, 2018
  • Reduction valve: why is it needed in the water supply system of the house?
    • December 3, 2024
  • Advantages of building a frame house on screw piles
    • January 23, 2019
  • How to build a bath from aerated concrete block
    • April 12, 2018
  • This object has such a fate that involuntarily allocates it among others in Kazakhstan. The bridge across the Ural River in the administrative center of the West Kazakhstan region began to be built in the “good old days”, that is, under the Soviet regime. Since the republic never had their own organizations specialized in this case, bridge builders from different Russian cities worked here here. Then there was a notorious “parade of sovereignty”, followed by an economic crisis. Although the construction of the bridge continued, however, the payment of the executed volumes was now constantly delayed, or even at all moved away for an indefinite period. For this reason, the bridge builders stopped working several times. However, the object in Uralsk is one of the most significant in Kazakhstan, and therefore did not forget about it: the press periodically woke up this topic. Increased attention is also explained by the fact that the bridge across the Urals does not just connect the two banks of the river, it makes up an important link on the shortest path from Central Asia to the European part of Russia. As a result, the story of the invitation of bridge builders from a neighboring state was repeated again and again, without a visible result. There is a rather funny moment in it. A couple of years ago, when the President of Kazakhstan Nursultan Nazarbayev arrived in Uralsk, the local authorities invited him to take part in the solemn open… bridge over the Urals. The head of state made sensory words and cut the red ribbon. But when the ceremony ended and the president left, the entrance to the bridge was closed. The fact is that every driver who would decide to update the shortest path from Central Asia to Russia could well have been on the other side, but at the bottom of the river. The object was not over. And the main difficulty was not so much in building a car transition through the Urals itself, but in the construction of multi -kilometer approaches to it through a constantly flooded floodplain. And work here still start and finish. And now in the republic they decided to return to the long -suffering object again. The Ministry of Transport and Communications of the Republic of Kazakhstan announced the competition for state procurement of works and services for the reconstruction of the bridge over the Ural River. The required delivery time within 2000. Potential suppliers who meet the qualification requirements stipulated in Article 10 of the Law of Kazakhstan “On public procurement” are allowed to the competition.
    • January 8, 2025
Recent Posts
  • The choice of the fittings of plastic windows
    • January 27, 2025
  • Choice of home tools: Electric saws
    • January 27, 2025
  • The choice of diesel generator is the main criteria and principles
    • January 24, 2025
AProject – all about construction and repair
  • © Projectical.net, 2017-2024. All Rights Reserved.

Input your search keywords and press Enter.