AProject
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments
AProject – all about construction and repair
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments

What is the sealing of the bathroom

  • June 25, 2018

During the repair of the bathroom, special attention should be paid to sealing seams. If moisture will seep on the floor and walls, mold and bacteria will appear on them. This problem can be solved by applying the sealing of the bath. There is more than one way to eliminate this situation, and each of them is used in certain conditions. For example, it can be the distance from the wall and the bathroom, the finish coating of which equipped with different surfaces. By the way, now many began to order concrete in Kyiv, because there are low prices there.

If the bathtub is located from the wall at a distance of no more than 0.5 cm, then you can use a special grout for ceramic tiles – fugu. Such a grout can be chosen at your discretion, it is only important that it is combined with the color shades of the bathroom, also intended for rooms with high humidity.

If the seams are additionally processed with a special brilliance of the grout is protected from the appearance of corrosion plaque and color change. In the same style, sealing the floor can also be carried out. The width of the gap exceeding 1 cm is sealed with a special sealant with increased moisture resistance. The most suitable in this case will be silicone – acrylic or silicone composition. The sealant can also be transparent, white or other shades.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

How to choose real estate on the secondary market

  • June 2, 2025
View Post

What apartments are chosen for purchase and their features

  • June 2, 2025
View Post

Detailed information on the possible risks of investing in real estate

  • June 2, 2025
View Post

Your windows and stairs in the house should be of high quality

  • January 16, 2025
View Post

Options for work with material gypsum cardboard

  • January 15, 2025
View Post

Oplaning options for a one -room apartment: ready -made solutions

  • January 14, 2025
View Post

DIY repair bathroom

  • January 10, 2025
View Post

Cosiness not only in the living room on the couch, but also complete comfort in the bathroom

  • January 8, 2025
Featured Posts
  • What is a rapid construction construction
    • May 7, 2018
  • DIY Wentfasse installation process
    • April 4, 2018
  • Design of engineering systems of cottages
    • February 6, 2019
  • This object has such a fate that involuntarily allocates it among others in Kazakhstan. The bridge across the Ural River in the administrative center of the West Kazakhstan region began to be built in the “good old days”, that is, under the Soviet regime. Since the republic never had their own organizations specialized in this case, bridge builders from different Russian cities worked here here. Then there was a notorious “parade of sovereignty”, followed by an economic crisis. Although the construction of the bridge continued, however, the payment of the executed volumes was now constantly delayed, or even at all moved away for an indefinite period. For this reason, the bridge builders stopped working several times. However, the object in Uralsk is one of the most significant in Kazakhstan, and therefore did not forget about it: the press periodically woke up this topic. Increased attention is also explained by the fact that the bridge across the Urals does not just connect the two banks of the river, it makes up an important link on the shortest path from Central Asia to the European part of Russia. As a result, the story of the invitation of bridge builders from a neighboring state was repeated again and again, without a visible result. There is a rather funny moment in it. A couple of years ago, when the President of Kazakhstan Nursultan Nazarbayev arrived in Uralsk, the local authorities invited him to take part in the solemn open… bridge over the Urals. The head of state made sensory words and cut the red ribbon. But when the ceremony ended and the president left, the entrance to the bridge was closed. The fact is that every driver who would decide to update the shortest path from Central Asia to Russia could well have been on the other side, but at the bottom of the river. The object was not over. And the main difficulty was not so much in building a car transition through the Urals itself, but in the construction of multi -kilometer approaches to it through a constantly flooded floodplain. And work here still start and finish. And now in the republic they decided to return to the long -suffering object again. The Ministry of Transport and Communications of the Republic of Kazakhstan announced the competition for state procurement of works and services for the reconstruction of the bridge over the Ural River. The required delivery time within 2000. Potential suppliers who meet the qualification requirements stipulated in Article 10 of the Law of Kazakhstan “On public procurement” are allowed to the competition.
    • January 8, 2025
  • It is possible and necessary to glue the wallpaper on the ceiling
    • August 29, 2018
Recent Posts
  • About the deadlines for apartment renovation: rules and advice
    • June 2, 2025
  • Carrying out apartment renovations under a contract
    • June 2, 2025
  • Handing over repairs: requirements, features and nuances
    • June 2, 2025
AProject – all about construction and repair
  • © Projectical.net, 2017-2024. All Rights Reserved.

Input your search keywords and press Enter.