AProject
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments
AProject – all about construction and repair
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments

Pygmalion and the choice of building materials

  • December 27, 2018

The person who builds himself a house feels like a pigminal. He builds not just housing for himself, he creates a friend or girlfriend if a woman is building a house.

Selection of building materials, the creation of a project is like a process of living life. Facade form adjustment is like a popular breast augmentation operation. And the shape and choice of material for windows is like a choice of shape and eye color that will look at you as often as a beloved woman.

This poetic principle is designed to substantiate the variety in the use of materials in the construction of a private house. Rarely the customer will say that he builds a house from a beam because it is an environmentally friendly material that holds the heat. The customer will say that he just likes the house from a wooden beam.

A person is building a house from natural stone using a forged iron in the design of the facade about the house as a strong friend. A friend who will protect him in difficult times.

Material, color, roof shape, also reflects the character of a person. Roof “broken” – a desire to make a house higher without additional investment. The roof is bright _ the desire to allocate its home, and the manifestation of love for your home. Desire to see him from afar. Roof made of soft roofing materials. Unwillingness to hear a knock, extra sounds, a desire for silence and comfort.

Each house is beautiful in its own way, like every person, with its own individuality, reflecting the individuality of the one who built it.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

Choosing windows for our home, we care about our family

  • January 24, 2025
View Post

Advantages of using mirror ceilings

  • January 21, 2025
View Post

Options for redevelopment of the apartment

  • January 13, 2025
View Post

This object has such a fate that involuntarily allocates it among others in Kazakhstan. The bridge across the Ural River in the administrative center of the West Kazakhstan region began to be built in the “good old days”, that is, under the Soviet regime. Since the republic never had their own organizations specialized in this case, bridge builders from different Russian cities worked here here. Then there was a notorious “parade of sovereignty”, followed by an economic crisis. Although the construction of the bridge continued, however, the payment of the executed volumes was now constantly delayed, or even at all moved away for an indefinite period. For this reason, the bridge builders stopped working several times. However, the object in Uralsk is one of the most significant in Kazakhstan, and therefore did not forget about it: the press periodically woke up this topic. Increased attention is also explained by the fact that the bridge across the Urals does not just connect the two banks of the river, it makes up an important link on the shortest path from Central Asia to the European part of Russia. As a result, the story of the invitation of bridge builders from a neighboring state was repeated again and again, without a visible result. There is a rather funny moment in it. A couple of years ago, when the President of Kazakhstan Nursultan Nazarbayev arrived in Uralsk, the local authorities invited him to take part in the solemn open… bridge over the Urals. The head of state made sensory words and cut the red ribbon. But when the ceremony ended and the president left, the entrance to the bridge was closed. The fact is that every driver who would decide to update the shortest path from Central Asia to Russia could well have been on the other side, but at the bottom of the river. The object was not over. And the main difficulty was not so much in building a car transition through the Urals itself, but in the construction of multi -kilometer approaches to it through a constantly flooded floodplain. And work here still start and finish. And now in the republic they decided to return to the long -suffering object again. The Ministry of Transport and Communications of the Republic of Kazakhstan announced the competition for state procurement of works and services for the reconstruction of the bridge over the Ural River. The required delivery time within 2000. Potential suppliers who meet the qualification requirements stipulated in Article 10 of the Law of Kazakhstan “On public procurement” are allowed to the competition.

  • January 8, 2025
View Post

You have a dishwasher in your kitchen

  • December 30, 2024
View Post

How to insulate the floor with expanded clay

  • December 25, 2024
View Post

Apartment renovation: make the ceiling with your own hands

  • December 17, 2024
View Post

Repair and decoration of turnkey apartments

  • December 12, 2024
Featured Posts
  • “Clean” brickwork – what is it
    • January 9, 2019
  • Facade repair: choice of plaster
    • December 10, 2024
  • Conducting concrete work in winter
    • March 6, 2019
  • How to properly make a waterproofing roof
    • June 27, 2018
  • .Bathroom tile
    • December 3, 2018
Recent Posts
  • The choice of the fittings of plastic windows
    • January 27, 2025
  • Choice of home tools: Electric saws
    • January 27, 2025
  • The choice of diesel generator is the main criteria and principles
    • January 24, 2025
AProject – all about construction and repair
  • © Projectical.net, 2017-2024. All Rights Reserved.

Input your search keywords and press Enter.