AProject
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments
AProject – all about construction and repair
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments

How to competently stick a wrestling border

  • May 2, 2018

The wrestling border is glued under the ceiling, by the floor and in the center of the room to divide into two parts, by the window and around the doors. Such borders perform more than one function – this is a decorative function, and to make the interior of the room extraordinary.

Using the border, you can visually reduce or increase, as well as distinguish between the space.

How to glue the room with borders?

At first, we glue the walls and ceiling with wallpaper, and only then we are engaged in a border for wallpaper. Now we decide where we will glue them? We examine the wall in advance where there will be borders. It should be dry, clean and without the remnants of glue from the previous pasting. If there are any pollution, it is necessary with the help of soapy solution to get rid of it. When examining the place, make sure there are no holes, cracks and other unpleasant defects. After all, we breed glue (you can use the one used for wallpapering). Apply to the surface of the wall and carefully apply the curb. Smooth it well and remove the remaining glue. When buying self -adhesive borders, you need to keep in mind that you do not need to hope for their sticky base, it is better to use glue too.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

What is Longling School in Shenzhen like after the renovation?

  • June 2, 2025
View Post

What did the kindergarten in Fukahori, Japan, look like after renovation?

  • June 2, 2025
View Post

The headquarters building of the Hi-Tech Park (HTP) in Vietnam

  • June 2, 2025
View Post

Choosing windows for our home, we care about our family

  • January 24, 2025
View Post

Advantages of using mirror ceilings

  • January 21, 2025
View Post

Options for redevelopment of the apartment

  • January 13, 2025
View Post

This object has such a fate that involuntarily allocates it among others in Kazakhstan. The bridge across the Ural River in the administrative center of the West Kazakhstan region began to be built in the “good old days”, that is, under the Soviet regime. Since the republic never had their own organizations specialized in this case, bridge builders from different Russian cities worked here here. Then there was a notorious “parade of sovereignty”, followed by an economic crisis. Although the construction of the bridge continued, however, the payment of the executed volumes was now constantly delayed, or even at all moved away for an indefinite period. For this reason, the bridge builders stopped working several times. However, the object in Uralsk is one of the most significant in Kazakhstan, and therefore did not forget about it: the press periodically woke up this topic. Increased attention is also explained by the fact that the bridge across the Urals does not just connect the two banks of the river, it makes up an important link on the shortest path from Central Asia to the European part of Russia. As a result, the story of the invitation of bridge builders from a neighboring state was repeated again and again, without a visible result. There is a rather funny moment in it. A couple of years ago, when the President of Kazakhstan Nursultan Nazarbayev arrived in Uralsk, the local authorities invited him to take part in the solemn open… bridge over the Urals. The head of state made sensory words and cut the red ribbon. But when the ceremony ended and the president left, the entrance to the bridge was closed. The fact is that every driver who would decide to update the shortest path from Central Asia to Russia could well have been on the other side, but at the bottom of the river. The object was not over. And the main difficulty was not so much in building a car transition through the Urals itself, but in the construction of multi -kilometer approaches to it through a constantly flooded floodplain. And work here still start and finish. And now in the republic they decided to return to the long -suffering object again. The Ministry of Transport and Communications of the Republic of Kazakhstan announced the competition for state procurement of works and services for the reconstruction of the bridge over the Ural River. The required delivery time within 2000. Potential suppliers who meet the qualification requirements stipulated in Article 10 of the Law of Kazakhstan “On public procurement” are allowed to the competition.

  • January 8, 2025
View Post

You have a dishwasher in your kitchen

  • December 30, 2024
Featured Posts
  • Side sliding: what is it, application
    • April 30, 2018
  • Warm floor equipment
    • October 16, 2018
  • Different options for kitchen design
    • November 28, 2024
  • How to perform waterproofing the floor yourself
    • June 29, 2018
  • How to use the machine in work correctly
    • August 6, 2018
Recent Posts
  • About the deadlines for apartment renovation: rules and advice
    • June 2, 2025
  • Carrying out apartment renovations under a contract
    • June 2, 2025
  • Handing over repairs: requirements, features and nuances
    • June 2, 2025
AProject – all about construction and repair
  • © Projectical.net, 2017-2024. All Rights Reserved.

Input your search keywords and press Enter.