AProject
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments
AProject – all about construction and repair
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments

Classification of the pool: what option to install at home

  • September 12, 2018

For many people, the pool at home remains only a pipe dream. But times are changing, new technologies, building materials appear, which allow you to reduce the cost of work. Today’s realities allow you to build pools of any shape. You can find out about various equipment for them here . ua, there you should also get acquainted with different useful information on this topic.

The type of pool is stationary and assembly. Having visited a specialized store, you can easily buy a prefabricated pool. It is designed for short -term use. Unlike him, a stationary structure – will last a long time.

A stationary pool of simple design can be built by yourself. By tearing and strengthening the foundation pit of the desired shape and the desired size, having made it waterproofing, you can begin to use the structure. Such work can take a couple of days. Such a structure is short -lived – the maximum will last one season.

The installation of the complex structure of the pool is associated with concreting the pit, installing a complex pipeline system, and the finish of the internal bowl with a mosaic. It sets the supply and removal of water from the pool. Before starting construction. Necessarily draw up a project of the future design, which takes into account all the details.

For the construction of the pool, large funds are involved, so it is worth entrusting this work to specialists. They have enough experience and knowledge in this matter. Using quite expensive materials, you should not take up construction yourself, as well as to adjust the builders so that they fit in some minimum time. It depends on the quality of the work performed how long this structure can last, as well as security.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

Choosing windows for our home, we care about our family

  • January 24, 2025
View Post

Advantages of using mirror ceilings

  • January 21, 2025
View Post

Options for redevelopment of the apartment

  • January 13, 2025
View Post

This object has such a fate that involuntarily allocates it among others in Kazakhstan. The bridge across the Ural River in the administrative center of the West Kazakhstan region began to be built in the “good old days”, that is, under the Soviet regime. Since the republic never had their own organizations specialized in this case, bridge builders from different Russian cities worked here here. Then there was a notorious “parade of sovereignty”, followed by an economic crisis. Although the construction of the bridge continued, however, the payment of the executed volumes was now constantly delayed, or even at all moved away for an indefinite period. For this reason, the bridge builders stopped working several times. However, the object in Uralsk is one of the most significant in Kazakhstan, and therefore did not forget about it: the press periodically woke up this topic. Increased attention is also explained by the fact that the bridge across the Urals does not just connect the two banks of the river, it makes up an important link on the shortest path from Central Asia to the European part of Russia. As a result, the story of the invitation of bridge builders from a neighboring state was repeated again and again, without a visible result. There is a rather funny moment in it. A couple of years ago, when the President of Kazakhstan Nursultan Nazarbayev arrived in Uralsk, the local authorities invited him to take part in the solemn open… bridge over the Urals. The head of state made sensory words and cut the red ribbon. But when the ceremony ended and the president left, the entrance to the bridge was closed. The fact is that every driver who would decide to update the shortest path from Central Asia to Russia could well have been on the other side, but at the bottom of the river. The object was not over. And the main difficulty was not so much in building a car transition through the Urals itself, but in the construction of multi -kilometer approaches to it through a constantly flooded floodplain. And work here still start and finish. And now in the republic they decided to return to the long -suffering object again. The Ministry of Transport and Communications of the Republic of Kazakhstan announced the competition for state procurement of works and services for the reconstruction of the bridge over the Ural River. The required delivery time within 2000. Potential suppliers who meet the qualification requirements stipulated in Article 10 of the Law of Kazakhstan “On public procurement” are allowed to the competition.

  • January 8, 2025
View Post

You have a dishwasher in your kitchen

  • December 30, 2024
View Post

How to insulate the floor with expanded clay

  • December 25, 2024
View Post

Apartment renovation: make the ceiling with your own hands

  • December 17, 2024
View Post

Repair and decoration of turnkey apartments

  • December 12, 2024
Featured Posts
  • House projects: which is better to choose?
    • February 11, 2019
  • How to build a summer shower in the country
    • September 28, 2018
  • GIBOLOGRACTION: Features of use
    • June 26, 2018
  • Bamboo wallpaper: varieties, advantages of use
    • April 11, 2018
  • Advantages of building from foam block.
    • January 22, 2019
Recent Posts
  • The choice of the fittings of plastic windows
    • January 27, 2025
  • Choice of home tools: Electric saws
    • January 27, 2025
  • The choice of diesel generator is the main criteria and principles
    • January 24, 2025
AProject – all about construction and repair
  • © Projectical.net, 2017-2024. All Rights Reserved.

Input your search keywords and press Enter.