AProject
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments
AProject – all about construction and repair
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments

We update the upholstery on our own

  • October 10, 2018

Furniture in any interior is an indispensable element. It is she who is able to create comfort and comfort. It’s a shame, but over time, the upholstery of your favorite sofa or chair is torn, wipes. In such cases, it needs to be replaced. When replacing upholstery, you need to know a few simple rules. Before you remove the old one, you need to take measurements, calculate the right amount of new fabric. When taking offers, do not forget about additional gaps. Pay special attention to armrests, seats. Leave small allowances. Container transportation of goods is now very popular, many companies use them.

Remember that when creating the old upholstery, they could use several options for its fastening. For example, some parts are nailed with nails, others – paper clips, and others are sewn. Just in case, take a picture of the furniture before you remove the old upholstery.

After acquiring a new fabric, time came to remove the old. To do this, use special tools. Try to do it carefully so as not to damage the frame itself. Having removed the upholstery, carefully inspect the legs, the furniture frame. Check it for strength, for the lack of cracks. If necessary, then repair.

When upholting furniture with a new fabric, you should remember about their special properties.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

Choosing windows for our home, we care about our family

  • January 24, 2025
View Post

Advantages of using mirror ceilings

  • January 21, 2025
View Post

Options for redevelopment of the apartment

  • January 13, 2025
View Post

This object has such a fate that involuntarily allocates it among others in Kazakhstan. The bridge across the Ural River in the administrative center of the West Kazakhstan region began to be built in the “good old days”, that is, under the Soviet regime. Since the republic never had their own organizations specialized in this case, bridge builders from different Russian cities worked here here. Then there was a notorious “parade of sovereignty”, followed by an economic crisis. Although the construction of the bridge continued, however, the payment of the executed volumes was now constantly delayed, or even at all moved away for an indefinite period. For this reason, the bridge builders stopped working several times. However, the object in Uralsk is one of the most significant in Kazakhstan, and therefore did not forget about it: the press periodically woke up this topic. Increased attention is also explained by the fact that the bridge across the Urals does not just connect the two banks of the river, it makes up an important link on the shortest path from Central Asia to the European part of Russia. As a result, the story of the invitation of bridge builders from a neighboring state was repeated again and again, without a visible result. There is a rather funny moment in it. A couple of years ago, when the President of Kazakhstan Nursultan Nazarbayev arrived in Uralsk, the local authorities invited him to take part in the solemn open… bridge over the Urals. The head of state made sensory words and cut the red ribbon. But when the ceremony ended and the president left, the entrance to the bridge was closed. The fact is that every driver who would decide to update the shortest path from Central Asia to Russia could well have been on the other side, but at the bottom of the river. The object was not over. And the main difficulty was not so much in building a car transition through the Urals itself, but in the construction of multi -kilometer approaches to it through a constantly flooded floodplain. And work here still start and finish. And now in the republic they decided to return to the long -suffering object again. The Ministry of Transport and Communications of the Republic of Kazakhstan announced the competition for state procurement of works and services for the reconstruction of the bridge over the Ural River. The required delivery time within 2000. Potential suppliers who meet the qualification requirements stipulated in Article 10 of the Law of Kazakhstan “On public procurement” are allowed to the competition.

  • January 8, 2025
View Post

You have a dishwasher in your kitchen

  • December 30, 2024
View Post

How to insulate the floor with expanded clay

  • December 25, 2024
View Post

Apartment renovation: make the ceiling with your own hands

  • December 17, 2024
View Post

Repair and decoration of turnkey apartments

  • December 12, 2024
Featured Posts
  • Bonistics: what is the specificity
    • June 11, 2018
  • How to make a drywall arch with your own hands
    • April 2, 2018
  • The main indicators of housing must be considered not a footage, but the quality
    • July 6, 2018
  • Options for materials for the construction of timber houses
    • January 13, 2025
  • What is carbon tissue
    • June 13, 2018
Recent Posts
  • The choice of the fittings of plastic windows
    • January 27, 2025
  • Choice of home tools: Electric saws
    • January 27, 2025
  • The choice of diesel generator is the main criteria and principles
    • January 24, 2025
AProject – all about construction and repair
  • © Projectical.net, 2017-2024. All Rights Reserved.

Input your search keywords and press Enter.