AProject
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments
AProject – all about construction and repair
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments

How to build a quick -made housing with your own hands

  • May 8, 2018

Good cottages in which you can live all year round. Houses are being built with the implementation of all SNiPs, and sometimes, for example, in terms of strength, they block their requirement on longitudinal load up to 4 times. Delivery to the customer occurs in the form of sets fully ready for assembly. When erecting these houses, all elements fit tightly to each other, t. To. They are produced in the factory according to pre -set sizes. To simplify installation, each element is assigned its own serial number. The assembly is carried out according to installation schemes, which in particular excludes the use of materials for other purposes.

As a result, the buyer receives a reliable and inexpensive house, characterized by strength and heat saving. At the request of the customer, thanks to the modular construction, the house can be given almost any kind. Since the house has a fairly small weight, saving occurs both on delivery and installation, and on the foundation device. The construction of the foundation for such a house is possible in just 1 day. In addition to high strength and stability, such houses are insensitive to seasonal soil movements.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

What is Longling School in Shenzhen like after the renovation?

  • June 2, 2025
View Post

What did the kindergarten in Fukahori, Japan, look like after renovation?

  • June 2, 2025
View Post

The headquarters building of the Hi-Tech Park (HTP) in Vietnam

  • June 2, 2025
View Post

Choosing windows for our home, we care about our family

  • January 24, 2025
View Post

Advantages of using mirror ceilings

  • January 21, 2025
View Post

Options for redevelopment of the apartment

  • January 13, 2025
View Post

This object has such a fate that involuntarily allocates it among others in Kazakhstan. The bridge across the Ural River in the administrative center of the West Kazakhstan region began to be built in the “good old days”, that is, under the Soviet regime. Since the republic never had their own organizations specialized in this case, bridge builders from different Russian cities worked here here. Then there was a notorious “parade of sovereignty”, followed by an economic crisis. Although the construction of the bridge continued, however, the payment of the executed volumes was now constantly delayed, or even at all moved away for an indefinite period. For this reason, the bridge builders stopped working several times. However, the object in Uralsk is one of the most significant in Kazakhstan, and therefore did not forget about it: the press periodically woke up this topic. Increased attention is also explained by the fact that the bridge across the Urals does not just connect the two banks of the river, it makes up an important link on the shortest path from Central Asia to the European part of Russia. As a result, the story of the invitation of bridge builders from a neighboring state was repeated again and again, without a visible result. There is a rather funny moment in it. A couple of years ago, when the President of Kazakhstan Nursultan Nazarbayev arrived in Uralsk, the local authorities invited him to take part in the solemn open… bridge over the Urals. The head of state made sensory words and cut the red ribbon. But when the ceremony ended and the president left, the entrance to the bridge was closed. The fact is that every driver who would decide to update the shortest path from Central Asia to Russia could well have been on the other side, but at the bottom of the river. The object was not over. And the main difficulty was not so much in building a car transition through the Urals itself, but in the construction of multi -kilometer approaches to it through a constantly flooded floodplain. And work here still start and finish. And now in the republic they decided to return to the long -suffering object again. The Ministry of Transport and Communications of the Republic of Kazakhstan announced the competition for state procurement of works and services for the reconstruction of the bridge over the Ural River. The required delivery time within 2000. Potential suppliers who meet the qualification requirements stipulated in Article 10 of the Law of Kazakhstan “On public procurement” are allowed to the competition.

  • January 8, 2025
View Post

You have a dishwasher in your kitchen

  • December 30, 2024
Featured Posts
  • How to get a effect with a fungal mold
    • April 30, 2018
  • Advantages of building a frame house on screw piles
    • January 23, 2019
  • How to whistle the surface correctly
    • September 20, 2018
  • Finishing materials for internal work
    • November 13, 2018
  • Advantages of the use of composite tiles.
    • January 16, 2019
Recent Posts
  • About the deadlines for apartment renovation: rules and advice
    • June 2, 2025
  • Carrying out apartment renovations under a contract
    • June 2, 2025
  • Handing over repairs: requirements, features and nuances
    • June 2, 2025
AProject – all about construction and repair
  • © Projectical.net, 2017-2024. All Rights Reserved.

Input your search keywords and press Enter.