AProject
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments
AProject – all about construction and repair
  • Architecture
  • Construction
  • Interior
  • Repair
  • Design
  • Real estate
  • Investments

How fresh repairs or construction of a house affects health

  • August 23, 2018

During the construction and repair of buildings, apartments and offices, great attention is paid to the choice of new windows, doors and of course the stairs if they were available. Due to the increased supply of this all in the market, the requirements for them also became increased.

First of all, special attention should be paid to the material from which certain decor items are made. When choosing products made of wood, you need to pay attention to ensuring that the amount of harmful substances used in processing is minimal and does not distinguish extraneous odors. The same requirements are imposed on both windows and stairs, windows should be without cracks, chips and fogging (if it is a double -glazed window). The production of such works as the repair or replacement of the roof complex is better to be carried out by qualified masters who have certain permits and tolerance for the work. There are many requirements for roofing materials:

– Increased strength as the roof itself, there are wooden structures.

– The material should not be toxic and secrete sharp smells.

-Not a combustible.

This is only a small part of the requirements for roofing materials, the main of which is not the unfortunate and resistance of fires. Also, with complex repairs, special attention should be paid to laying electrical networks, quality and reliability of elements. AVM LLC offers the best solutions to electrical problems. Currently, many different windows are presented on the market, the doors are made with cable channels to facilitate the laying of the wiring. In the manufacture of which all possible factors are calculated to protect against fires and electric shock. When choosing a stairs, you need to pay special attention to the material of manufacture, if these are metal stairs – pay attention to the quality of welds.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

Choosing windows for our home, we care about our family

  • January 24, 2025
View Post

Advantages of using mirror ceilings

  • January 21, 2025
View Post

Options for redevelopment of the apartment

  • January 13, 2025
View Post

This object has such a fate that involuntarily allocates it among others in Kazakhstan. The bridge across the Ural River in the administrative center of the West Kazakhstan region began to be built in the “good old days”, that is, under the Soviet regime. Since the republic never had their own organizations specialized in this case, bridge builders from different Russian cities worked here here. Then there was a notorious “parade of sovereignty”, followed by an economic crisis. Although the construction of the bridge continued, however, the payment of the executed volumes was now constantly delayed, or even at all moved away for an indefinite period. For this reason, the bridge builders stopped working several times. However, the object in Uralsk is one of the most significant in Kazakhstan, and therefore did not forget about it: the press periodically woke up this topic. Increased attention is also explained by the fact that the bridge across the Urals does not just connect the two banks of the river, it makes up an important link on the shortest path from Central Asia to the European part of Russia. As a result, the story of the invitation of bridge builders from a neighboring state was repeated again and again, without a visible result. There is a rather funny moment in it. A couple of years ago, when the President of Kazakhstan Nursultan Nazarbayev arrived in Uralsk, the local authorities invited him to take part in the solemn open… bridge over the Urals. The head of state made sensory words and cut the red ribbon. But when the ceremony ended and the president left, the entrance to the bridge was closed. The fact is that every driver who would decide to update the shortest path from Central Asia to Russia could well have been on the other side, but at the bottom of the river. The object was not over. And the main difficulty was not so much in building a car transition through the Urals itself, but in the construction of multi -kilometer approaches to it through a constantly flooded floodplain. And work here still start and finish. And now in the republic they decided to return to the long -suffering object again. The Ministry of Transport and Communications of the Republic of Kazakhstan announced the competition for state procurement of works and services for the reconstruction of the bridge over the Ural River. The required delivery time within 2000. Potential suppliers who meet the qualification requirements stipulated in Article 10 of the Law of Kazakhstan “On public procurement” are allowed to the competition.

  • January 8, 2025
View Post

You have a dishwasher in your kitchen

  • December 30, 2024
View Post

How to insulate the floor with expanded clay

  • December 25, 2024
View Post

Apartment renovation: make the ceiling with your own hands

  • December 17, 2024
View Post

Repair and decoration of turnkey apartments

  • December 12, 2024
Featured Posts
  • House projects: which is better to choose?
    • February 11, 2019
  • Repair and adjustment of control equipment.
    • December 11, 2024
  • Repair the living room in the style of country
    • December 12, 2024
  • Hyperpressed brick: reliable protection
    • July 2, 2018
  • DIY laminate care
    • January 6, 2025
Recent Posts
  • The choice of the fittings of plastic windows
    • January 27, 2025
  • Choice of home tools: Electric saws
    • January 27, 2025
  • The choice of diesel generator is the main criteria and principles
    • January 24, 2025
AProject – all about construction and repair
  • © Projectical.net, 2017-2024. All Rights Reserved.

Input your search keywords and press Enter.